Stellenbosch Landfill
A containerised high-temperature flare plant destroying landfill gas at the Stellenbosch municipal site.

A containerised high-temperature flare plant destroying landfill gas at the Stellenbosch municipal site.
Gas chilling for the EnviroServ Chloorkop registered CDM landfill-gas destruction project.
A 2,500 Nm³/h containerised CDM flare plant on one of Cape Town’s largest landfills.
The largest of the Cape Town containerised plants, with 3,000 Nm³/h of extraction capacity.
Containerised CDM flaring on the False Bay coast, engineered for salt air and sand.
A complete biogas train for an anaerobic digestion plant: roofs, buffer storage, chilling, boosting and flaring.
A de-humidification and boosting skid pushing brewery biogas one kilometre to the boiler house.
A 2,150 m³ double-membrane gas holder giving the works steady sewage gas for utilisation.
Gas chilling for a 2,000 Nm³/h landfill-gas-to-electricity plant in Johannesburg.
Six Hofstetter flares destroying underground methane at a listed CDM mine-gas project.
Mobile flare units that follow the mining face to burn coal-seam methane wherever it vents.
South Africa’s first successful landfill-gas-to-electricity CDM project, and the birthplace of Renew’s horizontal well technique.
No projects match that filter yet.
Send us your gas data, site layout or just a description of the problem. We will tell you what is realistic.