Vissershok Landfill

A 2,500 Nm³/h containerised CDM flare plant on one of Cape Town’s largest landfills.

Landfill gasCDM

The project

Vissershok is a CDM landfill-gas project on the northern edge of Cape Town. Renew delivered a containerised MGP 2500 plant: a Hofstetter high-temperature flare, twin extraction blowers and the full CDM measuring and data-logging package.

The plant was built and factory tested before shipping, keeping site time short and making the installation straightforward to relocate or expand as the gas field matures.

Project details

LocationCape Town, Western Cape
ClientFountain Green Energy
Commissioned
CategoryLandfill gas, CDM

Infrastructure supplied

  • Containerised plant MGP 2500
  • 1× Hofstetter high-temperature CDM flare, 2,500 Nm³/h
  • 2× gas blowers, 2,500 Nm³/h each
  • CDM measuring and data-logging equipment

Key figures

2,500Nm³/hFlare capacity
2Extraction blowers
2020Commissioned

Related work

All biogas projects

  • Stellenbosch Landfill
    Landfill gasCDM

    Stellenbosch Landfill

    A containerised high-temperature flare plant destroying landfill gas at the Stellenbosch municipal site.

    Stellenbosch, Western Cape

    View
  • Chloorkop Landfill
    Landfill gasCDM

    Chloorkop Landfill

    Gas chilling for the EnviroServ Chloorkop registered CDM landfill-gas destruction project.

    Mooifontein, Gauteng

    View
  • Bellville South Landfill
    Landfill gasCDM

    Bellville South Landfill

    The largest of the Cape Town containerised plants, with 3,000 Nm³/h of extraction capacity.

    Cape Town, Western Cape

    View

Have a similar site?

Every project starts with a conversation about your gas, your site and your goals.