Stellenbosch Landfill

A containerised high-temperature flare plant destroying landfill gas at the Stellenbosch municipal site.

Landfill gasCDM

The project

Stellenbosch is the newest addition to the Western Cape landfill programme delivered with Fountain Green Energy. The plant arrived as a complete, pre-commissioned MGP HTF 400 container so that civil works on site were limited to a slab, a fence and a gas connection.

The Hofstetter high-temperature flare inside the container destroys methane at well above 1,000 °C with the retention time demanded by Clean Development Mechanism methodologies, and the certified measurement train logs every cubic metre for emission-reduction accounting.

Project details

LocationStellenbosch, Western Cape
ClientFountain Green Energy
Commissioned
CategoryLandfill gas, CDM

Infrastructure supplied

  • Containerised plant MGP HTF 400
  • 1× Hofstetter high-temperature CDM flare
  • Certified flow, temperature and composition instrumentation

Key figures

400Nm³/hFlare capacity
>99.99%Destruction efficiency
2025Commissioned

Related work

All biogas projects

  • Chloorkop Landfill
    Landfill gasCDM

    Chloorkop Landfill

    Gas chilling for the EnviroServ Chloorkop registered CDM landfill-gas destruction project.

    Mooifontein, Gauteng

    View
  • Vissershok Landfill
    Landfill gasCDM

    Vissershok Landfill

    A 2,500 Nm³/h containerised CDM flare plant on one of Cape Town’s largest landfills.

    Cape Town, Western Cape

    View
  • Bellville South Landfill
    Landfill gasCDM

    Bellville South Landfill

    The largest of the Cape Town containerised plants, with 3,000 Nm³/h of extraction capacity.

    Cape Town, Western Cape

    View

Have a similar site?

Every project starts with a conversation about your gas, your site and your goals.