Stellenbosch, Western Cape

Stellenbosch Landfill

A containerised high-temperature flare plant destroying landfill gas at the Stellenbosch municipal site.

Landfill gasCDM
Stellenbosch Landfill site photograph
400Nm³/hFlare capacity
>99.99%Destruction efficiency
2025Commissioned

The project

Stellenbosch is the newest addition to the Western Cape landfill programme delivered with Fountain Green Energy. The plant arrived as a complete, pre-commissioned MGP HTF 400 container so that civil works on site were limited to a slab, a fence and a gas connection.

The Hofstetter high-temperature flare inside the container destroys methane at well above 1,000 °C with the retention time demanded by Clean Development Mechanism methodologies, and the certified measurement train logs every cubic metre for emission-reduction accounting.

Project details

LocationStellenbosch, Western Cape
ClientFountain Green Energy
Commissioned
CategoryLandfill gas, CDM

Infrastructure supplied

  • Containerised plant MGP HTF 400
  • 1× Hofstetter high-temperature CDM flare
  • Certified flow, temperature and composition instrumentation