Bellville South Landfill

The largest of the Cape Town containerised plants, with 3,000 Nm³/h of extraction capacity.

Landfill gasCDM

The project

Bellville South was commissioned alongside Coastal Park as part of the City of Cape Town’s landfill-gas destruction programme. The MGP 3000 container carries a 2,500 Nm³/h Hofstetter high-temperature flare fed by two 3,000 Nm³/h blowers.

All gas destroyed is metered with CDM-certified instrumentation so that Certified Emission Reductions can be verified and sold.

Project details

LocationCape Town, Western Cape
ClientFountain Green Energy
Commissioned
CategoryLandfill gas, CDM

Infrastructure supplied

  • Containerised plant MGP 3000
  • 1× Hofstetter high-temperature CDM flare, 2,500 Nm³/h
  • 2× gas blowers, 3,000 Nm³/h each
  • CDM measuring and data-logging equipment

Key figures

2,500Nm³/hFlare capacity
3,000Nm³/hBlower capacity
2018Commissioned

Related work

All biogas projects

  • Stellenbosch Landfill
    Landfill gasCDM

    Stellenbosch Landfill

    A containerised high-temperature flare plant destroying landfill gas at the Stellenbosch municipal site.

    Stellenbosch, Western Cape

    View
  • Chloorkop Landfill
    Landfill gasCDM

    Chloorkop Landfill

    Gas chilling for the EnviroServ Chloorkop registered CDM landfill-gas destruction project.

    Mooifontein, Gauteng

    View
  • Vissershok Landfill
    Landfill gasCDM

    Vissershok Landfill

    A 2,500 Nm³/h containerised CDM flare plant on one of Cape Town’s largest landfills.

    Cape Town, Western Cape

    View

Have a similar site?

Every project starts with a conversation about your gas, your site and your goals.