2,500Nm³/hFlare capacity
3,000Nm³/hBlower capacity
2018Commissioned
The project
Bellville South was commissioned alongside Coastal Park as part of the City of Cape Town’s landfill-gas destruction programme. The MGP 3000 container carries a 2,500 Nm³/h Hofstetter high-temperature flare fed by two 3,000 Nm³/h blowers.
All gas destroyed is metered with CDM-certified instrumentation so that Certified Emission Reductions can be verified and sold.
Project details
| Location | Cape Town, Western Cape |
|---|---|
| Client | Fountain Green Energy |
| Commissioned | |
| Category | Landfill gas, CDM |
Infrastructure supplied
- Containerised plant MGP 3000
- 1× Hofstetter high-temperature CDM flare, 2,500 Nm³/h
- 2× gas blowers, 3,000 Nm³/h each
- CDM measuring and data-logging equipment
Related work
More projects like this one.
- Stellenbosch LandfillStellenbosch, Western Cape · Fountain Green Energy A containerised high-temperature flare plant destroying landfill gas at the Stellenbosch municipal site.
- Chloorkop LandfillMooifontein, Gauteng · Energy Systems SA Gas chilling for the EnviroServ Chloorkop registered CDM landfill-gas destruction project.
- Vissershok LandfillCape Town, Western Cape · Fountain Green Energy A 2,500 Nm³/h containerised CDM flare plant on one of Cape Town’s largest landfills.
- Coastal Park LandfillCape Town, Western Cape · Fountain Green Energy Containerised CDM flaring on the False Bay coast, engineered for salt air and sand.