Double-membrane gas holder installation at Welgedacht wastewater treatment works
  1. Home
  2. Biogas
  3. Gas storage

Membrane gas storage

Storage that breathes with your plant.

Agrotel CenoTec double-membrane gas holders, digester roofs and buffer bags. Retrofit onto existing digesters or build free-standing, permanently gas-tight and maintenance free.

Overview

Gas production and withdrawal are never constant on a biogas plant. A gas holder buffers the difference, and Renew has partnered with Agrotel CenoTec, formerly Sattler, who invented the double-membrane gas holder in 1981.

The double-membrane design has proved itself over four decades and is now standard in modern wastewater treatment plant design. An outer membrane, kept taut by a small support-air blower, protects the inner gas membrane from weather and UV while the gas volume inside rises and falls freely.

Why membrane storage

  • Retrofit or free-standing. Storage can be mounted on top of existing digesters or built as a standalone structure to any desired volume.
  • Maintenance free, long service life. No moving seals, no water baths, no corrosion.
  • Quick to install. Days on site rather than months.
  • Permanently gas-tight. Losses are negligible and pressure to the users is constant.
  • Pre-conditioning built in. Optional sulphur-removal netting inside the holder starts the desulphurisation process before the gas even leaves storage.

The same membrane technology provides single- and double-layer digester roofs and flexible biogas buffer bags, and it is equally at home storing other combustible gases.

At a glance

TypeDouble-membrane gas holder
MountingOn digester or free-standing
VolumesAny desired volume; 2,150 m³ at Welgedacht
RoofsSingle- and double-layer AD roofs
Buffer bagsFlexible bags, 2,100 m³ at Harmony
OptionsSulphur-removal netting, level and pressure instrumentation
PartnerAgrotel CenoTec (formerly Sattler)

In the field

All biogas projects

  • Welgedacht Wastewater Treatment Works
    Sewage gasBiogas

    Welgedacht Wastewater Treatment Works

    A 2,150 m³ double-membrane gas holder giving the works steady sewage gas for utilisation.

    Welgedacht, Gauteng

    View
  • Harmony Gold Steyn 1
    Biogas

    Harmony Gold Steyn 1

    A complete biogas train for an anaerobic digestion plant: roofs, buffer storage, chilling, boosting and flaring.

    Welkom, Free State

    View
  • SAB Prospecton Brewery
    Biogas

    SAB Prospecton Brewery

    A de-humidification and boosting skid pushing brewery biogas one kilometre to the boiler house.

    Durban, KwaZulu-Natal

    View

Need this specified for your site?

Share your gas flow, composition and end use and we will size the right equipment and tell you what it will cost to run.