Harmony Gold Steyn 1
A complete biogas train for an anaerobic digestion plant: roofs, buffer storage, chilling, boosting and flaring.

The brewery’s effluent plant produces biogas that is worth far more in the boiler than in a flare. The challenge was distance: the boiler house sits roughly a kilometre from the digester.
Renew engineered a compact skid combining a FriCon gas chiller rated for 350 Nm³/h with a variable-speed centrifugal blower adding 300 mbar. Chilling drops the dew point so no condensate forms in the long pipeline, and the boost overcomes the pipeline pressure loss so the boiler always sees stable gas.
| Location | Durban, KwaZulu-Natal |
|---|---|
| Client | Talbot & Talbot |
| Commissioned | |
| Category | Biogas |



Related work
A complete biogas train for an anaerobic digestion plant: roofs, buffer storage, chilling, boosting and flaring.
A 2,150 m³ double-membrane gas holder giving the works steady sewage gas for utilisation.
A containerised high-temperature flare plant destroying landfill gas at the Stellenbosch municipal site.
Every project starts with a conversation about your gas, your site and your goals.