Stellenbosch Landfill
A containerised high-temperature flare plant destroying landfill gas at the Stellenbosch municipal site.

Methane released from the workings at Beatrix is both a safety hazard and a potent greenhouse gas. Gold Fields registered a CDM project to capture and destroy it, and Renew supplied the flaring equipment.
Three HOFGAS IFL1c units handle the smaller boreholes and three HOFGAS CFM4c flares take the main flows, up to 1,450 Nm³/h from a single unit. Every flare is instrumented so the destroyed methane earns Certified Emission Reductions while making the mine safer.
| Location | Welkom, Free State |
|---|---|
| Client | Gold Fields |
| Commissioned | |
| Category | Mine gas, CDM |


Related work
A containerised high-temperature flare plant destroying landfill gas at the Stellenbosch municipal site.
Gas chilling for the EnviroServ Chloorkop registered CDM landfill-gas destruction project.
A 2,500 Nm³/h containerised CDM flare plant on one of Cape Town’s largest landfills.
Every project starts with a conversation about your gas, your site and your goals.