Stellenbosch Landfill
A containerised high-temperature flare plant destroying landfill gas at the Stellenbosch municipal site.

Bisasar Road is one of the largest landfills in Africa and became South Africa’s first successful landfill-gas-to-electricity CDM project. Renew supplied the 2,000 Nm³/h HOFGAS LPM flare, twin 2,500 Nm³/h extraction blowers and the CDM measuring and data-logging equipment.
It is also where Renew pioneered horizontal gas wells in South Africa, an approach that lowers capital cost and starts extracting gas from a cell long before conventional vertical wells could be drilled.
| Location | Durban, KwaZulu-Natal |
|---|---|
| Client | Durban Cleansing and Solid Waste |
| Commissioned | |
| Category | Landfill gas, CDM |


Related work
A containerised high-temperature flare plant destroying landfill gas at the Stellenbosch municipal site.
Gas chilling for the EnviroServ Chloorkop registered CDM landfill-gas destruction project.
A 2,500 Nm³/h containerised CDM flare plant on one of Cape Town’s largest landfills.
Every project starts with a conversation about your gas, your site and your goals.