400Nm³/hFlare capacity
>99.99%Destruction efficiency
2025Commissioned
The project
Stellenbosch is the newest addition to the Western Cape landfill programme delivered with Fountain Green Energy. The plant arrived as a complete, pre-commissioned MGP HTF 400 container so that civil works on site were limited to a slab, a fence and a gas connection.
The Hofstetter high-temperature flare inside the container destroys methane at well above 1,000 °C with the retention time demanded by Clean Development Mechanism methodologies, and the certified measurement train logs every cubic metre for emission-reduction accounting.
Project details
| Location | Stellenbosch, Western Cape |
|---|---|
| Client | Fountain Green Energy |
| Commissioned | |
| Category | Landfill gas, CDM |
Infrastructure supplied
- Containerised plant MGP HTF 400
- 1× Hofstetter high-temperature CDM flare
- Certified flow, temperature and composition instrumentation
Related work
More projects like this one.
- Chloorkop LandfillMooifontein, Gauteng · Energy Systems SA Gas chilling for the EnviroServ Chloorkop registered CDM landfill-gas destruction project.
- Vissershok LandfillCape Town, Western Cape · Fountain Green Energy A 2,500 Nm³/h containerised CDM flare plant on one of Cape Town’s largest landfills.
- Bellville South LandfillCape Town, Western Cape · Fountain Green Energy The largest of the Cape Town containerised plants, with 3,000 Nm³/h of extraction capacity.
- Coastal Park LandfillCape Town, Western Cape · Fountain Green Energy Containerised CDM flaring on the False Bay coast, engineered for salt air and sand.