The project
At Harmony’s Steyn 1 shaft, biomass is digested to produce biogas that replaces fossil fuel on site. Renew supplied every gas-side element of the plant, from the membrane roofs on the digesters through to the flare.
Four 12 m Sattler CENO single-layer roofs seal the digesters, two 2,100 m³ buffer bags smooth out production, an Aprovis chiller dries the gas, and a duty/standby roots blower station delivers up to 1,500 Nm³/h to the users with a 500 Nm³/h Hofstetter MTF flare on standby.
Project details
| Location | Welkom, Free State |
|---|---|
| Client | Harmony Gold |
| Commissioned | |
| Category | Biogas |
Infrastructure supplied
- 4× Sattler CENO single-layer AD roofs, 12 m diameter
- 2× Sattler CENO biogas buffer bags, 2,100 m³ each
- 1× Hofstetter MTF biogas flare, 500 Nm³/h
- 1× Aprovis biogas chiller/drier
- Duty/standby roots blower station, up to 1,500 Nm³/h
Related work
More projects like this one.
- SAB Prospecton BreweryDurban, KwaZulu-Natal · Talbot & Talbot A de-humidification and boosting skid pushing brewery biogas one kilometre to the boiler house.
- Welgedacht Wastewater Treatment WorksWelgedacht, Gauteng · WEC Projects A 2,150 m³ double-membrane gas holder giving the works steady sewage gas for utilisation.