A 2,150 m³ double-membrane gas holder giving the works steady sewage gas for utilisation.

Sewage gasBiogas

The project

Digester gas production at a wastewater works never matches demand minute by minute. Welgedacht solved this with a 2,150 m³ Sattler double-membrane gas holder supplied and installed by Renew for WEC Projects.

The holder buffers production peaks, maintains constant delivery pressure to the gas users and keeps losses to a minimum with a permanently gas-tight inner membrane.

Project details

LocationWelgedacht, Gauteng
ClientWEC Projects
Commissioned
CategorySewage gas, Biogas

Infrastructure supplied

  • 1× Sattler double-membrane gas holder, 2,150 m³

Key figures

2,150Gas storage
2015Commissioned

Related work

All biogas projects

  • Harmony Gold Steyn 1
    Biogas

    Harmony Gold Steyn 1

    A complete biogas train for an anaerobic digestion plant: roofs, buffer storage, chilling, boosting and flaring.

    Welkom, Free State

    View
  • SAB Prospecton Brewery
    Biogas

    SAB Prospecton Brewery

    A de-humidification and boosting skid pushing brewery biogas one kilometre to the boiler house.

    Durban, KwaZulu-Natal

    View
  • Stellenbosch Landfill
    Landfill gasCDM

    Stellenbosch Landfill

    A containerised high-temperature flare plant destroying landfill gas at the Stellenbosch municipal site.

    Stellenbosch, Western Cape

    View

Have a similar site?

Every project starts with a conversation about your gas, your site and your goals.