2,150m³Gas storage
2015Commissioned
The project
Digester gas production at a wastewater works never matches demand minute by minute. Welgedacht solved this with a 2,150 m³ Sattler double-membrane gas holder supplied and installed by Renew for WEC Projects.
The holder buffers production peaks, maintains constant delivery pressure to the gas users and keeps losses to a minimum with a permanently gas-tight inner membrane.
Project details
| Location | Welgedacht, Gauteng |
|---|---|
| Client | WEC Projects |
| Commissioned | |
| Category | Sewage gas, Biogas |
Infrastructure supplied
- 1× Sattler double-membrane gas holder, 2,150 m³
Related work
More projects like this one.
- Harmony Gold Steyn 1Welkom, Free State · Harmony Gold A complete biogas train for an anaerobic digestion plant: roofs, buffer storage, chilling, boosting and flaring.
- SAB Prospecton BreweryDurban, KwaZulu-Natal · Talbot & Talbot A de-humidification and boosting skid pushing brewery biogas one kilometre to the boiler house.